SmartNRG Lähilämpö, connection fees

Water flow m³/hVAT 0% 
   VAT 25,5 % €
0,31 950,002 447,25
0,352 280,002 861,40
0,42 600,003 263,00
0,452 930,003 677,15
0,53 250,004 078,75
0,63 900,004 894,50
0,74 550,005 710,25
0,85 200,006 526,00
0,95 850,007 341,75
16 500,008 157,50
1,27 800,009 789,00
1,49 100,0011 420,50
1,610 400,0013 052,00
1,811 700,0014 683,50
213 000,0016 315,00
2,213 660,0017 143,30
2,414 320,0017 971,60
2,614 980,0018 799,90
2,815 640,0019 628,20
316 300,0020 456,50
3,216 960,0021 284,80
3,417 620,0022 113,10
3,618 280,0022 941,40
3,818 940,0023 769,70
419 600,0024 598,00
4,420 920,0026 254,60
4,822 240,0027 911,20
5,223 560,0029 567,80
5,624 880,0031 224,40
626 200,0032 881,00
6,427 520,0034 537,60
6,828 840,0036 194,20
7,230 160,0037 850,80
7,631 480,0039 507,40
832 800,0041 164,00
8,434 120,0042 820,60
8,835 440,0044 477,20
9,236 760,0046 133,80
9,638 080,0047 790,40
1039 400,0049 447,00
1141 200,0051 706,00
1243 000,0053 965,00
1344 800,0056 224,00
1446 600,0058 483,00
1548 400,0060 742,00
1650 200,0063 001,00
1752 000,0065 260,00
1853 800,0067 519,00
1955 600,0069 778,00
2057 400,0072 037,00
2260 300,0075 676,50
2463 200,0079 316,00
2666 100,0082 955,50
2869 000,0086 595,00
3071 900,0090 234,50
3274 800,0093 874,00
3477 700,0097 513,50
3680 600,00101 153,00
3883 500,00104 792,50
4086 400,00108 432,00
4289 300,00112 071,50
4492 200,00115 711,00
4695 100,00119 350,50
4898 000,00122 990,00
50100 900,00126 629,50
52103 800,00130 269,00
54106 700,00133 908,50
56109 600,00137 548,00
58112 500,00141 187,50
60115 400,00144 827,00
64121 200,00152 106,00
68127 000,00159 385,00
72132 800,00166 664,00
76138 600,00173 943,00
80144 400,00181 222,00

SmartNRG Lähilämpö, pipelinefees

Contracted water flow V (m³/h)Pipeline fee € / m (VAT 0 %)Pipeline fee € / m (VAT 24 %)
V≤0,3184230,92
0.3 < V ≤ 6221277,36
6 < V ≤ 20257322,54
20 < V ≤ 60295370,23
60 < V ≤ 80368461,84

If necessary, the connection fee will include additional costs for factors that would significantly impact the profitability of district heating operations in the area, such as low connection frequency or unfavourable geographical location. Tampereen Sähkölaitos Oy uses the connection and pipeline fees for building a district heating branch pipeline and a metering installation at the property’s heat distribution room. The connection fee does not include any surface construction work at the lot, such as mining, asphalting, bricklaying, turfing or planting.

SmartNRG Lähilämpö, power fees (rounded to nearest euro)

Water flow m³/hVAT 0 % €/month   VAT 25,5 % €/month
0,25367
0,256784
0,382103
0,35120151
0,4142178
0,45160201
0,5177222
0,6213267
0,7246309
0,8273343
0,9295370
1313393
1,2356447
1,4399501
1,6441553
1,8471591
2499626
2,2529664
2,4565709
2,6600753
2,8635797
3671842
3,2706886
3,4750941
3,6781980
3,88241 034
48681 089
4,49421 182
4,810241 285
5,210861 363
5,611681 466
612241 536
6,412821 609
6,813381 679
7,214071 766
7,614881 867
815681 968
8,416472 067
8,817282 169
9,217972 255
9,618662 342
1019382 432
1121042 641
1222692 848
1324773 109
1426773 360
1528613 591
1630783 863
1732734 108
1834334 308
1936514 582
2037894 755
2241195 169
2445785 745
2648906 137
2851626 478
3055957 022
3260207 555
3462967 901
3666948 401
3870098 796
4074399 336
4277249 694
44812610 198
46847010 630
48875410 986
50914711 479
52942511 828
54972412 204
56995012 487
581011512 694
601050613 185
641099113 794
681166014 633
721215315 252
761258715 797
801292716 223

SmartNRG Lähilämpö, power fees 1.1.2024–31.12.2024 (rounded to nearest euro)

Alv 25,5 % 1.9.2024 alkaen

Water flow m³/hVAT 0 % €/month   VAT 25,5 % €/month
0,250 63
0,2563 79
0,377 97
0,35112 141
0,4132 166
0,45149 187
0,5165 207
0,6199 250
0,7229 287
0,8255 320
0,9275 345
1292 366
1,2332 417
1,4372 467
1,6412 517
1,8440 552
2470 590
2,2499 626
2,4533 669
2,6566 710
2,8599 752
3633 794
3,2666 836
3,4707 887
3,6736 924
3,8777 975
4818 1 027
4,4888 1 114
4,8966 1 212
5,21024 1 285
5,61101 1 382
61188 1 491
6,41244 1 561
6,81299 1 630
7,21366 1 714
7,61444 1 812
81522 1 910
8,41599 2 007
8,81677 2 105
9,21744 2 189
9,61811 2 273
101881 2 361
112042 2 563
122202 2 764
132404 3 017
142599 3 262
152777 3 485
162988 3 750
173177 3 987
183333 4 183
193544 4 448
203678 4 616
223999 5 019
244444 5 577
264747 5 957
285011 6 289
305432 6 817
325844 7 334
346112 7 671
366499 8 156
386804 8 539
407222 9 064
427499 9 411
447889 9 901
468223 10 320
488499 10 666
508880 11 144
529150 11 483
549440 11 847
569660 12 123
589820 12 324
6010200 12 801
6410670 13 391
6811320 14 207
7211799 14 808
7612220 15 336
8012550 15 750

SmartNRG Lähilämpö, consumption fees 1.1.2025-

€/MWh per monthVAT 0 %VAT 25,5 %
January76,6096,13
February76,6096,13
March66,1082,96
April54,6068,52
May32,2040,41
June32,2040,41
July32,2040,41
August32,2040,41
September32,2040,41
October54,6068,52
November66,1082,96
December76,6096,13

SmartNRG Lähilämpö, consumption fees 1.1.2024–31.12.2024

€/MWh per monthVAT 0 %VAT 25,5 %
tammikuu69,9087,72
helmikuu69,9087,72
maaliskuu64,2080,57
huhtikuu52,7066,14
toukokuu41,1051,58
kesäkuu30,4038,15
heinäkuu30,4038,15
elokuu30,4038,15
syyskuu41,1051,58
lokakuu52,7066,14
marraskuu64,2080,57
joulukuu69,9087,72

SmartNRG Lähilämpö, Supplementary services 1.5.2025-

€/MWhVAT 0 %VAT 25,5 %
Uusiutuva1,201,51
Tuuli1,702,14

SmartNRG Hiedanranta, connection fees

Water flow m³/hVAT 0 % €VAT 25,5 % €
0,32 535,003 181,43
0,352 964,003 719,82
0,43 380,004 241,90
0,453 809,004 780,30
0,54 225,005 302,38
0,65 070,006 362,85
0,75 915,007 423,33
0,86 760,008 483,80
0,97 605,009 544,28
18 450,0010 604,75
1,210 140,0012 725,70
1,411 830,0014 846,65
1,613 520,0016 967,60
1,815 210,0019 088,55
216 900,0021 209,50
2,217 758,0022 286,29
2,418 616,0023 363,08
2,619 474,0024 439,87
2,820 332,0025 516,66
321 190,0026 593,45
3,222 048,0027 670,24
3,422 906,0028 747,03
3,623 764,0029 823,82
3,824 622,0030 900,61
425 480,0031 977,40
4,427 196,0034 130,98
4,828 912,0036 284,56
5,230 628,0038 438,14
5,632 344,0040 591,72
634 060,0042 745,30
6,435 776,0044 898,88
6,837 492,0047 052,46
7,239 208,0049 206,04
7,640 924,0051 359,62
842 640,0053 513,20
8,444 356,0055 666,78
8,846 072,0057 820,36
9,247 788,0059 973,94
9,649 504,0062 127,52
1051 220,0064 281,10
1153 560,0067 217,80
1255 900,0070 154,50
1358 240,0073 091,20
1460 580,0076 027,90
1562 920,0078 964,60
1665 260,0081 901,30
1767 600,0084 838,00
1869 940,0087 774,70
1972 280,0090 711,40
2074 620,0093 648,10
2278 390,0098 379,45
2482 160,00103 110,80
2685 930,00107 842,15
2889 700,00112 573,50
3093 470,00117 304,85
3297 240,00122 036,20
34101 010,00126 767,55
36104 780,00131 498,90
38108 550,00136 230,25
40112 320,00140 961,60
42116 090,00145 692,95
44119 860,00150 424,30
46123 630,00155 155,65
48127 400,00159 887,00
50131 170,00164 618,35
52134 940,00169 349,70
54138 710,00174 081,05
56142 480,00178 812,40
58146 250,00183 543,75
60150 020,00188 275,10
64157 560,00197 737,80
68165 100,00207 200,50
72172 640,00216 663,20
76180 180,00226 125,90
80187 720,00235 588,60

SmartNRG Hiedanranta, pipeline fees

Contracted water flow V (m³/h)Pipeline fee € / m (VAT 0 %)Pipeline fee € / m (VAT 24 %)
V≤0,3184230,92
0.3 < V ≤ 6221277,36
6 < V ≤ 20257322,54
20 < V ≤ 60295370,23
60 < V ≤ 80368461,84

If necessary, the connection fee will include additional costs for factors that would significantly impact the profitability of district heating operations in the area, such as low connection frequency or unfavourable geographical location. Tampereen Energia Oy uses the connection and pipeline fees for building a district heating branch pipeline and a metering installation at the property’s heat distribution room. The connection fee does not include any surface construction work at the lot, such as mining, asphalting, bricklaying, turfing or planting.

SmartNRG Hiedanranta, power fees (rounded to nearest euro)

Water flow m³/hVAT 0 % €/month   VAT 25,5 % €/month
0,25367
0,256784
0,382103
0,35120151
0,4142178
0,45160201
0,5177222
0,6213267
0,7246309
0,8273343
0,9295370
1313393
1,2356447
1,4399501
1,6441553
1,8471591
2499626
2,2529664
2,4565709
2,6600753
2,8635797
3671842
3,2706886
3,4750941
3,6781980
3,88241 034
48681 089
4,49421 182
4,810241 285
5,210861 363
5,611681 466
612241 536
6,412821 609
6,813381 679
7,214071 766
7,614881 867
815681 968
8,416472 067
8,817282 169
9,217972 255
9,618662 342
1019382 432
1121042 641
1222692 848
1324773 109
1426773 360
1528613 591
1630783 863
1732734 108
1834334 308
1936514 582
2037894 755
2241195 169
2445785 745
2648906 137
2851626 478
3055957 022
3260207 555
3462967 901
3666948 401
3870098 796
4074399 336
4277249 694
44812610 198
46847010 630
48875410 986
50914711 479
52942511 828
54972412 204
56995012 487
581011512 694
601050613 185
641099113 794
681166014 633
721215315 252
761258715 797
801292716 223

SmartNRG Hiedanranta, consumption fees

€/MWh per monthVAT 0 %VAT 25,5 %
january76,6096,13
february76,6096,13
march66,1082,96
april54,6068,52
may32,2040,41
june32,2040,41
july32,2040,41
august32,2040,41
september32,2040,41
october54,6068,52
november66,1082,96
december76,6096,13

Lähilämpö Hiilineutraali, power fees 1.1.–30.4.2025 (rounded to nearest euro)

Water flow m³/hVAT 0 % €/monthVAT25,5 % €/month
0,25367
0,256784
0,382103
0,35120151
0,4142178
0,45160201
0,5177222
0,6213267
0,7246309
0,8273343
0,9295370
1313393
1,2356447
1,4399501
1,6441553
1,8471591
2499626
2,2529664
2,4565709
2,6600753
2,8635797
3671842
3,2706886
3,4750941
3,6781980
3,88241 034
48681 089
4,49421 182
4,810241 285
5,210861 363
5,611681 466
612241 536
6,412821 609
6,813381 679
7,214071 766
7,614881 867
815681 968
8,416472 067
8,817282 169
9,217972 255
9,618662 342
1019382 432
1121042 641
1222692 848
1324773 109
1426773 360
1528613 591
1630783 863
1732734 108
1834334 308
1936514 582
2037894 755
2241195 169
2445785 745
2648906 137
2851626 478
3055957 022
3260207 555
3462967 901
3666948 401
3870098 796
4074399 336
4277249 694
44812610 198
46847010 630
48875410 986
50914711 479
52942511 828
54972412 204
56995012 487
581011512 694
601050613 185
641099113 794
681166014 633
721215315 252
761258715 797
801292716 223

Lähilämpö Hiilineutraali, power fees 1.1.2024–31.12.2024

VAT 0 % €/monthVAT 0 % €/monthVAT25,5 % €/month
0,250 63
0,2563 79
0,377 97
0,35112 141
0,4132 166
0,45149 187
0,5165 207
0,6199 250
0,7229 287
0,8255 320
0,9275 345
1292 366
1,2332 417
1,4372 467
1,6412 517
1,8440 552
2470 590
2,2499 626
2,4533 669
2,6566 710
2,8599 752
3633 794
3,2666 836
3,4707 887
3,6736 924
3,8777 975
4818 1 027
4,4888 1 114
4,8966 1 212
5,21024 1 285
5,61101 1 382
61188 1 491
6,41244 1 561
6,81299 1 630
7,21366 1 714
7,61444 1 812
81522 1 910
8,41599 2 007
8,81677 2 105
9,21744 2 189
9,61811 2 273
101881 2 361
112042 2 563
122202 2 764
132404 3 017
142599 3 262
152777 3 485
162988 3 750
173177 3 987
183333 4 183
193544 4 448
203678 4 616
223999 5 019
244444 5 577
264747 5 957
285011 6 289
305432 6 817
325844 7 334
346112 7 671
366499 8 156
386804 8 539
407222 9 064
427499 9 411
447889 9 901
468223 10 320
488499 10 666
508880 11 144
529150 11 483
549440 11 847
569660 12 123
589820 12 324
6010200 12 801
6410670 13 391
6811320 14 207
7211799 14 808
7612220 15 336
8012550 15 750

Lähilämpö Hiilineutraali, consumption fees 1.1.–30.4.2025

€/MWh per monthVAT 0 %VAT 25,5 %
January77,897,64
February77,897,64
March67,384,46
April55,870,03
May33,441,92
June33,441,92
July33,441,92
August33,441,92
September33,441,92
October55,870,03
November67,384,46
December77,897,64

Lähilämpö Hiilineutraali, consumption fees 1.1.2024–31.12.2024

€/MWh per monthVAT 0 %VAT 25,5 %
January71,1089,23
February71,1089,23
March65,4082,08
April53,9067,64
May42,3053,09
June31,6039,66
July31,6039,66
August31,6039,66
September42,3053,09
October53,9067,64
November65,4082,08
December71,1089,23

Service fees

Invoicing

ServiceVAT 0 % VAT 24 % 
Copy of invoice3,63 € 4,50 € 
Payment arrangement3,63 € 4,50 € 
Payment reminder5,00 € 
Collection visit fee45,00 €  
Meter reading in connection with change of ownerFreeFree
Review of invoices for one year/metering point17,47 € 22,00 € 
Expert services and reviews concerning the metering point79,84 € / h 99,00 €

Reports

ServiceVAT 0 % VAT 24 % 
District heating usage report once per yearFreeFree
Usage report at the customer’s request16,13 €  20,00 € 

Disconnection and reconnection of heating delivery

ServicesVAT 0 % VAT 24 % 
Disconnection during normal business hours between 8 a.m. and 4 p.m. 79,84 €  
Connection on the following business day after the order or later (order placed by 2.30 p.m. on the previous business day)FreeFree
Urgent connection during business days between 8 a.m. and 4 p.m. (order placed by 12 noon)129,84 € 161,00 € 

Technical service fees

Inspection of an energy meter at the customer’s request, in writing

ServiceVAT 0 % VAT 24 % 
Inspection of an energy meter at the customer’s request, in writing. Contracted water flow up to 6 m³/h. 419,36 €  520,00 € 
Inspection of an energy meter at the customer’s request, in writing. Contracted water flow more than 6 m³/h.559,68 € 694,00 € 
Inspection of an energy meter at the customer’s request, in writing. Gas measurement.According to the costs incurredAccording to the costs incurred

Energy consumption monitoring

ServiceAlv 0 % Alv 24 % 
Pulse connection during metering (impulse output) 69,36 €  86,00 € 
Pulse connection during metering (M-Bus output)69,36 € 86,00 € 
Pulse connection as a separate assignment (impulse output)251,61 € 312,00 € 
Pulse connection as a separate assignment (M-Bus output)*251,61 € 312,00 € 
Making an EDI connection (MSCONS)/ metering point8,00 € 9,92 € 
Online service for monitoring energy consumption, among other thingsFreeFree

Technical customer service

ServiceAlv 0 % Alv 24 % 
Handover inspection of the property’s customer equipment120,16 € 149,00 € 
Condition inspection of the property’s customer equipment120,16 € 149,00 € 
Usage guidance for the property’s heating or cooling system79,84 € / h 99,00 € / h 
Operational inspection of the property’s heating or cooling system79,84 € 99,00 € 

Review of district heating invoicing water flow

ServiceVAT 0 % VAT 24 % 
Review of water flow annually after the heating seasonFree Free
Restricting the water flow at the customer’s requestAccording to the costs incurredAccording to the costs incurred

Changes to the connection

ServiceVAT 0 % VAT 24 % 
Dismantling of the connection**1500,00 € 1860,00 € 
Modifications of the connection at the customer’s request (ordered assignment)According to the costs incurredAccording to the costs incurred

*The bus output may require a meter replacement. The charge for the replacement is determined by the costs incurred.

** The price includes disconnecting the connection from the main line, plugging the property penetration, dismantling the internal line and removing the measuring centre. Other construction work not included.