If necessary, the connection fee will include additional costs for factors that would significantly impact the profitability of district heating operations in the area, such as low connection frequency or unfavourable geographical location. Tampereen Sähkölaitos Oy uses the connection and pipeline fees for building a district heating branch pipeline and a metering installation at the property’s heat distribution room. The connection fee does not include any surface construction work at the lot, such as mining, asphalting, bricklaying, turfing or planting.
SmartNRG Lähilämpö, power fees (rounded to nearest euro)
Water flow m³/h
VAT 0 % €/month
VAT 25,5 % €/month
0,2
53
67
0,25
67
84
0,3
82
103
0,35
120
151
0,4
142
178
0,45
160
201
0,5
177
222
0,6
213
267
0,7
246
309
0,8
273
343
0,9
295
370
1
313
393
1,2
356
447
1,4
399
501
1,6
441
553
1,8
471
591
2
499
626
2,2
529
664
2,4
565
709
2,6
600
753
2,8
635
797
3
671
842
3,2
706
886
3,4
750
941
3,6
781
980
3,8
824
1 034
4
868
1 089
4,4
942
1 182
4,8
1024
1 285
5,2
1086
1 363
5,6
1168
1 466
6
1224
1 536
6,4
1282
1 609
6,8
1338
1 679
7,2
1407
1 766
7,6
1488
1 867
8
1568
1 968
8,4
1647
2 067
8,8
1728
2 169
9,2
1797
2 255
9,6
1866
2 342
10
1938
2 432
11
2104
2 641
12
2269
2 848
13
2477
3 109
14
2677
3 360
15
2861
3 591
16
3078
3 863
17
3273
4 108
18
3433
4 308
19
3651
4 582
20
3789
4 755
22
4119
5 169
24
4578
5 745
26
4890
6 137
28
5162
6 478
30
5595
7 022
32
6020
7 555
34
6296
7 901
36
6694
8 401
38
7009
8 796
40
7439
9 336
42
7724
9 694
44
8126
10 198
46
8470
10 630
48
8754
10 986
50
9147
11 479
52
9425
11 828
54
9724
12 204
56
9950
12 487
58
10115
12 694
60
10506
13 185
64
10991
13 794
68
11660
14 633
72
12153
15 252
76
12587
15 797
80
12927
16 223
SmartNRG Lähilämpö, power fees 1.1.2024–31.12.2024 (rounded to nearest euro)
If necessary, the connection fee will include additional costs for factors that would significantly impact the profitability of district heating operations in the area, such as low connection frequency or unfavourable geographical location. Tampereen Energia Oy uses the connection and pipeline fees for building a district heating branch pipeline and a metering installation at the property’s heat distribution room. The connection fee does not include any surface construction work at the lot, such as mining, asphalting, bricklaying, turfing or planting.
SmartNRG Hiedanranta, power fees (rounded to nearest euro)
Water flow m³/h
VAT 0 % €/month
VAT 25,5 % €/month
0,2
53
67
0,25
67
84
0,3
82
103
0,35
120
151
0,4
142
178
0,45
160
201
0,5
177
222
0,6
213
267
0,7
246
309
0,8
273
343
0,9
295
370
1
313
393
1,2
356
447
1,4
399
501
1,6
441
553
1,8
471
591
2
499
626
2,2
529
664
2,4
565
709
2,6
600
753
2,8
635
797
3
671
842
3,2
706
886
3,4
750
941
3,6
781
980
3,8
824
1 034
4
868
1 089
4,4
942
1 182
4,8
1024
1 285
5,2
1086
1 363
5,6
1168
1 466
6
1224
1 536
6,4
1282
1 609
6,8
1338
1 679
7,2
1407
1 766
7,6
1488
1 867
8
1568
1 968
8,4
1647
2 067
8,8
1728
2 169
9,2
1797
2 255
9,6
1866
2 342
10
1938
2 432
11
2104
2 641
12
2269
2 848
13
2477
3 109
14
2677
3 360
15
2861
3 591
16
3078
3 863
17
3273
4 108
18
3433
4 308
19
3651
4 582
20
3789
4 755
22
4119
5 169
24
4578
5 745
26
4890
6 137
28
5162
6 478
30
5595
7 022
32
6020
7 555
34
6296
7 901
36
6694
8 401
38
7009
8 796
40
7439
9 336
42
7724
9 694
44
8126
10 198
46
8470
10 630
48
8754
10 986
50
9147
11 479
52
9425
11 828
54
9724
12 204
56
9950
12 487
58
10115
12 694
60
10506
13 185
64
10991
13 794
68
11660
14 633
72
12153
15 252
76
12587
15 797
80
12927
16 223
SmartNRG Hiedanranta, consumption fees
€/MWh per month
VAT 0 %
VAT 25,5 %
january
76,60
96,13
february
76,60
96,13
march
66,10
82,96
april
54,60
68,52
may
32,20
40,41
june
32,20
40,41
july
32,20
40,41
august
32,20
40,41
september
32,20
40,41
october
54,60
68,52
november
66,10
82,96
december
76,60
96,13
Lähilämpö Hiilineutraali (no longer available from May 1, 2025)
Expert services and reviews concerning the metering point
79,84 € / h
99,00 €
Reports
Service
VAT 0 %
VAT 24 %
District heating usage report once per year
Free
Free
Usage report at the customer’s request
16,13 €
20,00 €
Disconnection and reconnection of heating delivery
Services
VAT 0 %
VAT 24 %
Disconnection during normal business hours between 8 a.m. and 4 p.m.
79,84 €
Connection on the following business day after the order or later (order placed by 2.30 p.m. on the previous business day)
Free
Free
Urgent connection during business days between 8 a.m. and 4 p.m. (order placed by 12 noon)
129,84 €
161,00 €
Technical service fees
Inspection of an energy meter at the customer’s request, in writing
Service
VAT 0 %
VAT 24 %
Inspection of an energy meter at the customer’s request, in writing. Contracted water flow up to 6 m³/h.
419,36 €
520,00 €
Inspection of an energy meter at the customer’s request, in writing. Contracted water flow more than 6 m³/h.
559,68 €
694,00 €
Inspection of an energy meter at the customer’s request, in writing. Gas measurement.
According to the costs incurred
According to the costs incurred
Energy consumption monitoring
Service
Alv 0 %
Alv 24 %
Pulse connection during metering (impulse output)
69,36 €
86,00 €
Pulse connection during metering (M-Bus output)
69,36 €
86,00 €
Pulse connection as a separate assignment (impulse output)
251,61 €
312,00 €
Pulse connection as a separate assignment (M-Bus output)*
251,61 €
312,00 €
Making an EDI connection (MSCONS)/ metering point
8,00 €
9,92 €
Online service for monitoring energy consumption, among other things
Free
Free
Technical customer service
Service
Alv 0 %
Alv 24 %
Handover inspection of the property’s customer equipment
120,16 €
149,00 €
Condition inspection of the property’s customer equipment
120,16 €
149,00 €
Usage guidance for the property’s heating or cooling system
79,84 € / h
99,00 € / h
Operational inspection of the property’s heating or cooling system
79,84 €
99,00 €
Review of district heating invoicing water flow
Service
VAT 0 %
VAT 24 %
Review of water flow annually after the heating season
Free
Free
Restricting the water flow at the customer’s request
According to the costs incurred
According to the costs incurred
Changes to the connection
Service
VAT 0 %
VAT 24 %
Dismantling of the connection**
1500,00 €
1860,00 €
Modifications of the connection at the customer’s request (ordered assignment)
According to the costs incurred
According to the costs incurred
*The bus output may require a meter replacement. The charge for the replacement is determined by the costs incurred.
** The price includes disconnecting the connection from the main line, plugging the property penetration, dismantling the internal line and removing the measuring centre. Other construction work not included.